Protecting Value Across the Capital Lifecycle
EXPERIENCE
Equipment knowledge, production insight and lifecycle experience informing performance and capital decisions.
TacminMadini’s capabilities draw on practical experience across mining and construction fleets supporting production, earthworks, infrastructure delivery and rehabilitation. Equipment selection, fleet matching, benchmarking, procurement, capital and operating cost assessments, maintenance and lifecycle planning developed understanding of how asset capability influences productivity, reliability and commercial performance.
The experience presented includes historical assignments undertaken by Tacmin and TacminMadini, together with experience gained by their founder and contributing consultants. This foundation informs asset performance assessment and improvement priorities, while supporting the definition of practical requirements for technology adoption and systems integration.
Assessed equipment capability against production requirements, material characteristics, conditions and schedules. Fleet sizing, loading and haulage assessments, cycle-time analysis and equipment matching informed selection and deployment, aligning production capacity with project and operating requirements.
Evaluated equipment alternatives, supplier proposals and owner-versus-contractor options against technical and commercial requirements. Capital, ownership, operating, maintenance and replacement cost assessments informed procurement recommendations, expenditure planning and decisions across the equipment lifecycle.
Applied production analysis, equipment benchmarking and deployment reviews to assess fleet balance, utilisation and operating constraints. Changes to equipment allocation, operating practices and performance controls supported improved productivity, stronger plan adherence and more effective use of assets and resources.
Managed maintenance strategies, spares, rebuilds and replacement planning across production and construction fleets. Coordinated maintenance and operating requirements to support availability, contain downtime and align condition and lifecycle expenditure with delivery and production objectives.
| Equipment category / type | Size / capacity | Studies & Planning | Selection & Matching | Cost Estimation | Procurement | Benchmarking | Maintenance Analysis | Application Designs | Operations |
|---|---|---|---|---|---|---|---|---|---|
| MINING EQUIPMENT | |||||||||
| Hydraulic excavators & shovels | 100–<200 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Hydraulic excavators & shovels | 200–<400 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Hydraulic excavators & shovels | 400–<600 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | — |
| Hydraulic excavators & shovels | 600–800 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | — |
| Rigid haul trucks | 50–<100 t payload | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Rigid haul trucks | 100–<200 t payload | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Rigid haul trucks | 200–<300 t payload | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Rigid haul trucks | 300–400 t payload | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | — |
| Articulated dump trucks | 25–<35 t payload | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Articulated dump trucks | 35–<45 t payload | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Articulated dump trucks | 45–60 t payload | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Crawler dozers | 40–<70 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Crawler dozers | 70–<100 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Crawler dozers | 100–120 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Wheel dozers | 40–<70 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Wheel dozers | 70–110 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | — |
| Wheel loaders | 7–<12 m³ bucket | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Wheel loaders | 12–<20 m³ bucket | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Wheel loaders | 20–40 m³ bucket | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Production drill rigs | 100–<150 mm hole | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Production drill rigs | 150–<200 mm hole | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Production drill rigs | 200–<250 mm hole | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Production drill rigs | 250–<300 mm hole | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | — |
| Production drill rigs | 300–400 mm hole | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | — |
| Motor graders | 25–<40 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Motor graders | 40–<60 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Motor graders | 60–80 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Mine water trucks | 30–<60 kL | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Mine water trucks | 60–<100 kL | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Mine water trucks | 100–150 kL | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| CONSTRUCTION EQUIPMENT | |||||||||
| Hydraulic excavators | 20–100 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Crawler dozers | 15–70 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Wheel loaders | 2–12 m³ bucket | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Motor graders | 15–40 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Backhoe loaders | 8–12 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Compact track loaders | 0.7–2 t capacity | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Track loaders | 15–35 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Wheel tractor-scrapers | 15–40 m³ bowl | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Smooth-drum rollers | 10–27 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Padfoot rollers | 10–27 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Tandem asphalt rollers | 5–15 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Pneumatic-tyred rollers | 15–35 t | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Asphalt pavers | 3–13 m width | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Reclaimers / stabilisers | 2–2.5 m width | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
| Construction water trucks | 10–40 kL | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
No equipment matches your selection.
✓ Experience recorded — Not recorded. t = operating weight unless marked payload or capacity; m³ = volume; kL = tank capacity; mm hole = drill-hole diameter. Scroll across to view all experience disciplines.
Project experience. Operating knowledge. Informed decisions. Practical outcomes.
Sarel Blaauw
senior partner
+61 498 785 165