The mining industry has entered an era where closure is no longer an end-of-life exercise. It is a life-of-mine commitment, planned from the first day of operation, measured continuously, and proven with evidence that satisfies regulators, reassures investors, and earns community trust.

 

In 2025, global updates to the ICMM’s Integrated Mine Closure Good Practice Guide and new laws in multiple jurisdictions have redefined the standard. Closure obligations now require integration into operational strategy, live performance tracking, and independent verification that every commitment is met.

 

This is no longer simply about avoiding fines or satisfying a regulator’s checklist. It is about protecting your licence to operate, safeguarding stakeholder confidence, and leaving behind a post-mining legacy of value, in the most demanding compliance environment our industry has ever faced.

From Plans on Paper to Proof in Practice

The ICMM framework is clear: closure success depends on integration, transparency, and continuous validation. A well-written plan is meaningless unless it is:

 

  • Stress-tested for constructability.
  • Aligned with realistic costs and schedules.
  • Embedded within operational processes from day one.

 

Progressive rehabilitation, once optional, is now a compliance expectation. It reduces final closure liabilities, builds institutional learning, and enables early demonstration of performance against closure KPIs.

 

Transparency has become non-negotiable. Stakeholders expect live, auditable data showing environmental, social, and economic commitments are being delivered exactly as promised, not after the fact, but as work progresses.

 

The Execution Gap

Many operations in logistically isolated mining regions face unique resource challenges when advancing progressive rehabilitation. These often include:

 

  • Coordinating limited equipment between production and rehabilitation tasks.
  • Sourcing materials and specialist services within remote supply chains.
  • Aligning rehabilitation schedules with operational demands in isolated locations.
  • Maintaining real-time visibility of progress and compliance in dispersed work areas.

 

It’s in this execution gap — between what is approved and what is delivered — that TacminMadini proves its value.

 

Delivering on ICMM-Aligned Obligations

When you appoint TacminMadini, [see compliant mine rehabilitation] you gain a partner whose delivery model directly supports ICMM principles and turns compliance commitments into verifiable outcomes:

 

  • Integrated & Iterative Planning – Closure is embedded into your mine plan from the outset, adapting to changing conditions, regulations, and operational priorities.
  • Progressive Rehabilitation – Staged rehabilitation is incorporated into operational works, reducing the scope, time, and cost of final closure.
  • Transparency & Auditability – Structured project management and digital oversight ensure real-time tracking, milestone validation, and regulator-ready reporting.
  • Stakeholder Confidence – Independent oversight and evidence-based assurance strengthen your position with governments, investors, and communities.
  • Post-Closure Value Creation – Land uses are planned for community and economic benefit, turning closure into a lasting positive legacy.

 

The TacminMadini Advantage

Since 1996, we’ve delivered mine rehabilitation and closure projects in some of the most complex jurisdictions and geographies. These assignments have included fully compliant mine restoration projects covering:

 

  • Compliant mine rehabilitation studies – design, planning, and costing.
  • Turnkey mine rehabilitation on both contractor and owner-operator bases.
  • Turnkey progressive mine rehabilitation on a project management basis.
  • Preparation of owner-operator and contractor compliant mine rehabilitation tenders.
  • Oversight and project management of compliant mine rehabilitation.

 

Follow this link to explore some of our most challenging and successful restoration projects.

 

From Remote Constraints to Proven Rehabilitation Delivery

Whether working alongside your team or taking full turnkey accountability via our BlueForge O&M model, we align execution with ICMM principles, ESG objectives, and regulatory demands, ensuring closure is delivered on time, on budget, and to a verifiable standard globally.

 

We source fleets, resources, and personnel locally, employing and training regional teams to international standards to build skills, ensure continuity, and deliver lasting community benefit. All activity is managed under a single accountable system for cost, schedule, and performance, with real-time tracking via Tacmin.ai.

 

If you’re planning or executing mine closure, let’s discuss how we can turn your compliance obligations into proven, on-ground success.

 