Rehabilitation planning & tenders
Turning closure designs into executable, cost-aligned delivery packages
Introduction: TacminMadini converts rehabilitation and closure designs into fully buildable, execution-ready packages that are compliant, cost-aligned, and practical in the field. Our structured approach bridges the gap between design intent and on-ground reality—ensuring every scope is measurable, resourced, sequenced, and costed for efficient delivery. Packages are prepared for either competitive tender or direct execution, including cases where owners’ equipment is used, giving clients a clear, actionable plan with assured compliance, efficiency, and measurable results.
Rehabilitation plan conversion
Turning closure concepts into measurable, build-ready work scopes.
Cost definition & tender documentation
Structuring tenders for accuracy, transparency, and performance control
Integration for on-ground success
Embedding practicality, buildability, and local benefit
Summary: Our Rehabilitation Planning & Tender Structuring service eliminates uncertainty between closure designs and site execution. By combining digital modelling, cost alignment, and precise documentation, we ensure every rehabilitation plan is fully costed and execution-ready—whether for tender or direct delivery—with measurable, accountable results.
Explore more services in MINE RESTORATION here:
Rehabilitation planning & tenders
The main objective of the environmental monitoring control centre is to track, control, and manage environmental aspects during rehabilitation. By leveraging real-time data from interconnected sensors, TacminMadini ensures climate monitoring, water quality optimization, geotechnical stability, vegetation health, erosion prevention, and sediment control.
our off-site project control centre
works in close collaboration with
our on-site project control expertise