______________ Green. Clean. Connected
______________ Green. Clean. Connected
Rehabilitation planning & tender structuring
Rehabilitation planning & tenders
Turning closure designs into executable, cost-aligned delivery packages
Introduction: TacminMadini converts rehabilitation and closure designs into fully buildable, execution-ready packages that are compliant, cost-aligned, and practical in the field. Our structured approach bridges the gap between design intent and on-ground reality—ensuring every scope is measurable, resourced, sequenced, and costed for efficient delivery. Packages are prepared for either competitive tender or direct execution, including cases where owners’ equipment is used, giving clients a clear, actionable plan with assured compliance, efficiency, and measurable results.
OUR FOCUS AREAS
Turning closure concepts into measurable, build-ready work scopes.
|
Structuring tenders for accuracy, transparency, and performance control
|
Embedding practicality, buildability, and local benefit
|
Explore more services in MINE RESTORATION here:
Rehabilitation planning & tenders
The main objective of the environmental monitoring control centre is to track, control, and manage environmental aspects during rehabilitation. By leveraging real-time data from interconnected sensors, TacminMadini ensures climate monitoring, water quality optimization, geotechnical stability, vegetation health, erosion prevention, and sediment control.
our off-site project control centre
works in close collaboration with
our on-site project control expertise
Sarel Blaauw
senior partner
+61 498 785 165