Rehabilitation designs, plans & tenders
Rehab design, plans & tenders
Turning closure designs into executable, cost-aligned delivery packages
Many rehabilitation and closure projects fall short not because the environmental intent is wrong, but because the designs are not build-ready, the costing is unreliable, or the execution logic fails under real field constraints. TacminMadini closes that gap by delivering fully engineered, DCM-integrated rehabilitation packages that can be priced, sequenced, resourced, and delivered with confidence. By combining digital construction management systems with decades of mining and civil experience, we ensure every design is practical, compliant, measurable, and structured for competitive tendering or direct execution — including projects executed using an owner’s fleet.
OUR FOCUS AREAS
Turning closure concepts into engineered, build-ready designs
Are your rehabilitation plans genuinely executable — or do they remain conceptual documents disconnected from field reality? |
| Most closure designs never translate cleanly into construction because the build logic, quantities, and QA requirements aren’t integrated from the start. |
| We convert rehabilitation concepts into fully engineered, execution-ready plans using a DCM-enabled digital twin. Quantities, sequencing, construction logic, QA checkpoints, and resource models are integrated upfront, producing a practical, costed package ready for tender or direct implementation. This ensures the plan is efficient, buildable, and aligned with environmental, safety, and delivery obligations. |
Structuring tenders for accuracy, transparency, and performance control
Are your projects being managed with true lifecycle discipline — or are gaps between engineering, procurement, and execution quietly driving risk? |
| Weak scope definition and unstructured BoQs lead to inconsistent pricing, contractor disputes, and early-stage slippage. |
| We prepare detailed Bills of Quantities, technical scopes, and execution-ready documentation aligned with safety, environmental, and QA compliance. Every package is configured for DCM-based performance tracking, ensuring pricing is accurate, responsibilities are clear, and post-award oversight is transparent and enforceable. |
Embedding practicality, buildability, and local benefit
Will your rehabilitation strategy stand up once machines are in the field — or are constructability gaps waiting to surface during execution? |
| Even well-intentioned closure plans fail when they overlook real-world constraints, local resources, or buildability factors. |
We validate constructability, resourcing, sequencing, and operational readiness before the project reaches site. QA frameworks, milestone validation, and performance reporting are embedded upfront to protect delivery quality. Each package maximises local workforce participation and ensures practical, measurable outcomes that stand up in the field — not just on paper. |
Explore more services in MINE RESTORATION here:
Rehabilitation planning & tenders
The main objective of the environmental monitoring control centre is to track, control, and manage environmental aspects during rehabilitation. By leveraging real-time data from interconnected sensors, TacminMadini ensures climate monitoring, water quality optimization, geotechnical stability, vegetation health, erosion prevention, and sediment control.
our off-site project control centre
works in close collaboration with
our on-site project control expertise