06.06.2023
The FEED phase is the most critical time for controlling costs, optimising the design and confirming the project execution strategy.
The FEED phase is the most critical time for controlling costs, optimising the design and confirming the project execution strategy.
Recent Posts
Sarel Blaauw
senior partner
+61 498 785 165